What is the Dallas Horseshoe Project?

 

The Dallas Horseshoe Project is a $798 million design-build roadway construction project by the Texas Department of Transportation (TxDOT) to improve traffic flow through the heart of downtown Dallas. Aptly dubbed the “Horseshoe project” due to its U shape, the project is dedicated to “Fixin’ the Mix”. Construction improvements include the expansion, repaving and addition of several new bridges and roadways along interstates 30 and 35E; and the construction of a new signature bridge, the Margaret McDermott Bridge, over I-30.

 

The project started in April 2013 and is scheduled to be complete as early as 2017. Once completed, drivers should experience improved safety, increased capacity and improved mobility through the downtown Dallas Mixmaster and the central business district.

 

Click Here For More Information

Horseshoe Storefront Project Information Center

If you would like to see additional information and details about the Horseshoe Project, please visit the Horseshoe Storefront Project Information Center.

 

Horseshoe Storefront Project Information Center

PLC Project Office
160 Continental Ave.
Dallas, TX 75207

 

The Storefront is open to the public and has maps and construction timelines, including information on traffic and lane closures.

 

Job Inquiries

Please call PLC’s job line at 972-421-2444. You can also apply by emailing your resume to jobs@plcjv.com, or in person at 160 Continental Ave, Dallas, TX 75207 (Monday through Friday from 8-11 a.m. and 1-4 p.m.)

Construction/Traffic Alerts

  • Colorado Boulevard from Jefferson Boulevard to Eads Avenue is now open with temporary paving beneath I-35E as well as the new permanent off-ramp and temporary off-ramp. The boulevard and ramps were opened ahead of schedule. Please note the new permanent Colorado Boulevard off-ramp is south of its original location, just after the Eight Street exit. The new temporary on-ramp to NB I-35E is accessible off of Colorado Boulevard. View flier.

Upcoming Closures

Continuing Closures

  • A temporary traffic shift has changed access to downtown and Lamar Street from northbound I-35E to eastbound I-30 direct connector. Please note this access is changing only for traffic coming northbound I-35E to eastbound I-30 direct for about 90 days. There is no change to the access for traffic from southbound I-35E or I-30. View flier.
  •  

  • The right exit to Reunion Boulevard from northbound I-35E is closed and traffic is directed to use the existing left exit until further notice. View flier.
  •  

  • The westbound I-30 frontage road to access southbound I-35E is closed for drivers using the Akard Street on-ramp . Traffic will be detoured to use the Hardwood Street on-ramp to access southbound I-35E. View flier.
  •  

  • The northbound I-35E frontage road between the Reunion Boulevard exit ramp and Reunion Boulevard reduced to one lane until further notice.
  •  

  • The Colorado Boulevard on-ramp and off-ramp at northbound I-35E and the eastbound and westbound lanes of Colorado Boulevard under I-35E are closed until approximately fall of this year. View flier.
  •  

  • The eastbound I-30 collector distributor lanes between Hotel and Griffin streets is reduced to two lanes until further notice.
  •  

  • The westbound I-30 frontage road between Beckley Avenue and Avery Street is reduced to one lane. View map.
  •  

  • The westbound I-30 frontage road between Avery Street and Sylvan Avenue is reduced to two lanes View map.
  •  

  • Avery Street between westbound I-30 frontage road and Hardwick Street is closed. Traffic will be detoured west on Comstock Street to Hardwick Street and then south to access the westbound I-30 frontage road. View map.
  •  

  • The westbound to eastbound I-30 underpass U-turn at Sylvan Avenue is closed. View map.
  •  

  • All eastbound lane of eastbound Colorado Boulevard between Jefferson and I-35E is closed for construction activities until further notice.

 

Dallas Horseshoe Project:
Interactive Construction/Traffic Map

 


View Horseshoe Project in a larger map

Click icons in map for more information.

Legend

 

Early Construction Areas

  • I-30 along the frontage road traveling eastbound between Sylvan Ave. and Beckley Ave.
  • Bridges crossing the Trinity River along I-30 with no impact to current traffic on the existing bridges
  • Eastbound I-30 and northbound I-35E exit ramp and frontage road to Commerce street going into downtown Dallas
  • Westbound I-30 collector-distributor road between Harwood Street and Lamar Street with no disruption to mainlines
  • Mainline and frontage road bridge outside of existing bridges traveling both northbound and southbound on I-35E between Colorado Blvd. and Riverfront Blvd.
  • Northbound I-35E frontage road between Eighth Street and Colorado Blvd.